How Long Does It Take to Renovate a House? Real Timelines from Concord and Charlotte

“How long?” matters as much as “how much?” — especially if you’re about to move in. Here are the real construction ranges we publish, the time that comes before construction, and how to plan your move around them.

Ronaldo BlancoOwner · Starlights Renovations 6 min read Updated Sep 30, 2026
Open kitchen and living area after a whole-home renovation

The short answer

It depends on what you renovate — and on what happens before anyone picks up a tool. These are the construction ranges we publish for our own projects in Concord and the Charlotte metro:

Bathroom
1–5 weeks

1–2 weeks for a refresh on the current layout; 3–5 weeks for a complete remodel with a custom tile shower.

Kitchen
1–10 weeks

1–3 weeks for a refresh, 4–6 for a full mid-range remodel, 6–10 when walls or plumbing move.

Paint, floors & HVAC
Days to weeks

A system replacement on existing ductwork is usually about a day; paint and floors depend on size and prep.

Whole-house projects combine those pieces. One recent example from our reviews: a 1996 home with three full bathrooms, refinished hardwood, new carpet and pool regrouting — renovated in about a month.

The time before construction starts

Most delays happen before the first day on site. Plan for these steps:

StepTypical timeWhat happens
Walkthrough & estimate
48 hours after the visitWe measure, note every item and send a written, itemized price (with 3D for kitchens and baths).
Design changes
A few daysYou adjust finishes and layout on screen until it’s right.
Material lead times
2–8 weeksCabinets are usually the longest wait; tile, fixtures and countertops follow.
Scheduling
VariesTrades are booked in order so each arrives when the previous one finishes.

Buying the house? Use the time before closing. If you get the estimate during your due diligence, materials can be chosen and ordered while you close — so construction can start soon after you get the keys. See renovation estimates for home buyers.

Kitchen demolition during a whole-home renovation
Demolition is fast; what takes time is everything planned around it.

In what order do the rooms get done?

  • Behind the walls first. Plumbing, electrical and HVAC changes come before drywall and paint.
  • Kitchens and bathrooms next — they have the longest lead times and the most trades.
  • Paint before floors in most projects, so new floors aren’t splashed; trim touch-ups at the end.
  • Final walkthrough with you, room by room, before we call it done.

What makes a renovation take longer

  • Changing your mind mid-project. Deciding in 3D first avoids most of this.
  • Special-order materials with long lead times.
  • Hidden damage found once walls are open — we stop, show you photos and price it in writing before doing any extra work.
  • Living in the house during the work, which means phasing rooms instead of doing everything at once.

Want a real timeline for your house?

Free walkthrough, written estimate in 48 hours and a schedule you can plan your move around. We reply in under 1 hour.

Get my estimate

How to plan your move-in

If you’re buying, the smoothest path is: estimate during due diligence → order materials before closing → build right after closing → move in to a finished home. If you already own the house, plan around the rooms you need most — usually the kitchen and one bathroom.

Related: how long a kitchen remodel takes, whole-home renovation.

Ronaldo Blanco — Owner, Starlights Renovations

Ronaldo owns Starlights Renovations in Kannapolis, NC, and prices every project personally. The timelines in this guide are the ranges Starlights publishes for its own kitchen and bathroom projects. More about us.

Questions, answered

Quick answers to common questions.

Still have a question?

Call (980) 766-7097 · Mon–Fri, 8–6

How long does a whole-house renovation take?

It depends on the scope. Combine the pieces: bathrooms take 1–5 weeks each, kitchens 1–10 weeks of construction, plus material lead times. One recent project — three bathrooms, hardwood refinishing and carpet — took about a month.

How long does a kitchen remodel take?

1–3 weeks for a refresh, 4–6 weeks for a full mid-range remodel and 6–10 weeks when layout changes are involved, plus 2–8 weeks of material lead time. Full guide: how long a kitchen remodel takes.

Can I renovate before I move in?

Yes — the best way is to get the estimate during your due diligence, choose materials before closing and start right after you get the keys.

Can we live in the house during the renovation?

Often yes, by phasing the work room by room. It takes longer than an empty house, and we plan it with you.

In our clients’ words

Don’t take our word for it. Read theirs.

Real reviews from real Starlights clients, straight from Google.

Get my free 3D design

Buying a home?

Get your numbers before closing.

  • A reply in under 1 hour
  • Written, itemized estimate in 48 hours
  • Agents & inspectors welcome

Step 1 of 3

What does the new house need?

Not sure yet? Pick the closest — we’ll sort it out at the walkthrough. Prefer to talk? Call (980) 766-7097

When would you like the work done?
Where should we send your estimate?

We only use your details to contact you about your project. No spam, never shared.

Call Get my free estimate